🗺️ Bitcoin2 Roadmap 2025 → 2026The Bitcoin2 journey begins now.This roadmap outlines the major milestones from devnet to full mainnet and beyond. It is designed to be transparent, achievable, and community-driven.
🔹 Phase 1 — Devnet Launch (Q3 2025)- Release of the Bitcoin2 L1 PoW blockDAG protocol.
- ~1 second block times, 21M BTC2 hard cap.
- Initial test wallets, block explorer, and mining guides.
- Treasury split enabled (10% block rewards → community DAO fund).
🔹 Phase 2 — L2 Online (Q4 2025)- EVM-compatible Layer 2 environment for smart contracts and governance.
- Deployment of Wrapped BTC2 (WBTC2) for apps and liquidity.
- First test contracts (DAO voting, multisig, treasury management).
🔹 Phase 3 — Governance & Treasury (Q1 2026)- Launch of the Treasury DAO on L2.
- Community proposals, voting, and on-chain execution.
- Grants for devs, audits, tools, and community outreach.
🔹 Phase 4 — Bridge v1 (Q2 2026)- Mint/burn bridge between L1 ↔ L2.
- Secure WBTC2 flow for DeFi, governance, and liquidity.
- Basic cross-chain integrations begin.
🔹 Phase 5 — Privacy Pilot (Q3 2026)- Stealth addresses implemented on testnet.
- zk-send prototype for private transfers.
- Community feedback and audits.
🔹 Phase 6 — Rollup Migration (Q4 2026)- Upgrade from devnet EVM to a production rollup (zk/OP) anchored to Bitcoin2 L1.
- Scaling apps, DAOs, and DeFi securely on top of Bitcoin2.
- Solidify Bitcoin2 as a long-term L1 + L2 dual-layer ecosystem.
⚡ Roadmap Principles- Transparent: Every step is open-source and community-audited.
- Incremental: Security and stability come before hype.
- Inclusive: Non-coders can help test, vote, and guide decisions.
📢 This roadmap is not just ours — it’s yours too.Anyone can propose changes, improvements, or new ideas through the Forum and Treasury DAO.
👉 Together, we are building the
Ideal Upgrade to Bitcoin.